ENTSOG is required to publish a draft cost-benefit analysis (CBA) methodology for hydrogen infrastructure projects, in accordance with Article 11 of the recast Trans-European Networks for Energy (TEN-E) Regulation. ACER contracted VIS Economic & Energy Consultants to conduct a study to identify recommendations for European Network of Transmission System Operators for Gas’s (ENTSOG’s) future CBA methodology for hydrogen infrastructure.

This report is for subscribers only Start with a FREE 30-day trial and then save up to 22% with an annual subscription. Get instant access to over 300 reports. Cancel anytime.
FREE TRIAL
Already a subscriber ? Log in
RELATED POSTS