Stimulated Geologic Hydrogen: 2025 State of Play & What’s Next

Stimulated-Geologic-Hydrogen-Production

The author concludes that commercial-scale output of simulated geological hydrogen is unlikely before the mid-2030s without multi-year pilots and clearer standards. This report maps the emerging field of stimulated geologic hydrogen—engineering the subsurface to make H2 in-situ via methods such as Electrical Reservoir Stimulation (ERS) and Advanced Weathering Enhancement (AWE). Most approaches sit at TRL 2–6 (ERS/AWE most advanced), with […]

This report is for subscribers only Start with a FREE 30-day trial and then save up to 22% with an annual subscription. Get instant access to over 300 reports. Cancel anytime.
FREE TRIAL
Already a subscriber ? Log in
RELATED POSTS