Hydrogen-Conference-2024 Hydrogen-Conference-2024 Hydrogen-Conference-2024

The economics of a one-gigawatt green hydrogen plant

The Hydrohub GigaWatt-Scale Electrolyzer project has produced an advanced design for such a 1-GW green hydrogen plant, which would use alkaline water electrolysis (AWE) and polymer electrolyte membrane (PEM) water electrolysis, and which could start up in 2030. This project shows that anticipated total investment cost levels of 730 €/kW or 1580 €/(kg/d) for AWE and 830 €/kW or 1770 […]

This report is for subscribers only Start with a FREE 30-day trial and then save up to 26% with an annual subscription. Get instant access to over 300 reports. Cancel anytime.
FREE TRIAL
Already a subscriber ? Log in

RELATED CONTENT

Brighten Up Your Thursday!

SIGN UP to receive our free weekly newsletter with new shipping market reports, presentations & analysis! EVERY THURSDAY!